- 3 September, 2018
- Francisco Gallego
- Comment: 0
- Projects
The basic engineering of the high voltage electrical substation in Agadir (Morocco) has been completed. This basic engineering makes it possible to determine and delimit all aspects of the substation – the structure of the elements, the foundations and all its installations.